- Remove forward and back sections of system of production of the fulfilled gases.
- Remove forward and back driveshafts (see Removal and installation of driveshafts) — at once after removal of a back shaft muffle an opening of a back epiploon in order to avoid hit in dirt assembly. Try not to damage an epiploon, walls of its landing nest and a pin of the sliding collar.
- Disconnect an electrical wiring of sensors switches of provisions (N-4LO and Pacific Rim) and switchings of the modes of the transfer case, forward RPM meter, and an executive electric motor.
|
- Disconnect a control lever switching from the external executive lever.
|
|
- Prop up the transfer case a transmission jack.
|
|
- Release fixture and separate a box from assembly of AT.
|
|
- Installation is made upside-down. Track that all fixture was tightened with the required effort.
|
|