Service of the Infiniti QX4 since 1996 of release
1. Introduction
2. Maintenance instruction
3. Routine maintenance
4. Engine
5. Cooling system and heating
6. Feed and control systems
7. Systems of start and charge
8. Transmission line
8.1. 4-staged automatic transmission
8.2. Transfer case
8.3. Differentials, power shafts / half shafts
8.3.1. General information and check of a condition of components
8.3.2. Removal and installation of differentials
8.3.3. Replacement of sealing laying of forward differential
8.3.4. Removal and installation of a connecting flange and replacement of an epiploon of back differential
8.3.5. Removal, service and installation of the oil pump
8.3.6. Removal and installation of back half shafts
8.4. Driveshafts
9. Brake system
10. Suspension bracket and steering
11. Body
12. Electric equipment
 














8-3-2-snyatie-i-ustanovka-differencialov.html

8.3.2. Removal and installation of differentials

 PERFORMANCE ORDER

  1. Remove the forward driveshaft (see Removal and installation of driveshafts) — at once to a zakuporta an opening in the transfer case for the purpose of the prevention of hit in dirt assembly.
  2. Remove forward section of the transfer case.
  3. Remove a power shaft.
  4. Turn out bolts of fastening of assembly of forward main transfer.
  5. Installation is made upside-down.
  1. In conclusion fill in necessary amount of lubricant liquid of the required grade in assembly of differential.


Back differential

 PERFORMANCE ORDER

  1. The car also establish to Poddomkratta it on props (see the illustration Scheme of an Institution of Props for fixing of the car in the lifted situation). Prop up also a case of assembly of the back bridge.
  2. Merge lubricant liquid.
  3. Having marked original landing situation, remove the back driveshaft (see Removal and installation of driveshafts) — at once to a zakuporta an opening in the transfer case for the purpose of the prevention of hit in dirt assembly.
  4. Remove half shafts (see Removal and installation of back half shafts).
  5. Otsoyediinte an electrical wiring from wheel ABS sensors.
  6. Turn out bolts of fastening of differential to a case of the back bridge.
  7. Turn out bolts of fastening of assembly of reverse main gear.
  1. Installation is made upside-down — track correctness of placement of sealing laying.
  1. In conclusion fill in necessary amount of lubricant liquid of the required grade in assembly of differential.


"on the page back
8.3.1. General information and check of a condition of components
on the following page"
8.3.3. Replacement of sealing laying of forward differential