Service of the Infiniti QX4 since 1996 of release
1. Introduction
2. Maintenance instruction
3. Routine maintenance
4. Engine
5. Cooling system and heating
6. Feed and control systems
7. Systems of start and charge
8. Transmission line
8.1. 4-staged automatic transmission
8.2. Transfer case
8.3. Differentials, power shafts / half shafts
8.3.1. General information and check of a condition of components
8.3.2. Removal and installation of differentials
8.3.3. Replacement of sealing laying of forward differential
8.3.4. Removal and installation of a connecting flange and replacement of an epiploon of back differential
8.3.5. Removal, service and installation of the oil pump
8.3.6. Removal and installation of back half shafts
8.4. Driveshafts
9. Brake system
10. Suspension bracket and steering
11. Body
12. Electric equipment
 














8-3-3-zamena-uplotnitelnojj-prokladki-perednego-differenciala.html

8.3.3. Replacement of sealing laying of forward differential

 PERFORMANCE ORDER

  1. Merge lubricant liquid and remove a back cover of forward differential.
  1. Remove sealing laying.
  1. Prepare new laying.
  2. Installation is made as it should be, the return to an order of dismantle of components.


"on the page back
8.3.2. Removal and installation of differentials
on the following page"
8.3.4. Removal and installation of a connecting flange and replacement of an epiploon of back differential